FIRMWARE DISCOVERY SPRINT
In Two Weeks, Know What Your Firmware Costs to Build. Or Your Money Back.
Send your requirements or just tell us what the device has to do. Your tech lead hands you a clickable prototype within 48 hours, then the MCU and RTOS choice, the update path, the test rig design and a build estimate you can take to your board.
US$ 900 · special price through Dec 31, 2026 · 10 slots at this price
Paid upfront when the sprint starts. No value, full refund.
In two weeks you get
Within 48 hours
A clickable prototype of the app or dashboard, adjusted with you over the two weeks.
The architecture
MCU and RTOS choice with the reasoning written down, connectivity, the OTA and secure-boot path, and where certification cost lands.
The plan
A hardware-in-the-loop test rig design for your board (built in the project, yours to keep) and an estimate with a fixed-price option.
Proof
"Yes, they delivered what was needed in the time frame that was required. Always prepaired to go the extra mile for the project to succeed."
"The team at ByteNana is top tier. They always know how to accomplish whatever programming project I throw at them. They're easy to work with and always friendly. I highly recommend!"
5.0 on Clutch across 12 verified reviews · Read all 12 reviews (opens in a new tab) ↗
Multotec: a vibration model running on the ESP32 itself decides which telemetry each mining sensor sends. 100% Job Success on Upwork (Top Rated).
How it works
- Send your requirements under NDA, or tell us what the device has to do (2 minutes).
- Meet your tech lead within 2 business days.
- Two weeks later: prototype, architecture, test rig design, estimate.
The terms
- Paid upfront, when the sprint starts.
- If you don't see value in what it delivers, we refund it in full.
- Build with us within 30 days and the full fee comes off.
Questions
Can firmware really be done remotely?
Most of it, and we tell you up front which part isn't. You ship us a dev board and we work on it with live debug sessions during your working day: bring-up, drivers, connectivity, the update path. Our team works from Brazil, 1 to 2 hours ahead of New York, so those sessions happen in your office hours, not overnight. When a test needs hands on the hardware, your hardware person runs it while we drive, on a shared screen with the debugger open. When that isn't enough, one of us takes an overnight flight and lands with no jet lag. The same team has spent more than seven years on Multotec's sensor-to-cloud system: C++ and FreeRTOS firmware on ESP32 smart sensors in mines, an on-device vibration model that decides which telemetry each sensor sends, and OTA updates. In the Sprint, the test rig design is part of the plan, so the remote setup for your board is written down before the build starts.
We don't have a requirements document.
You don't need one. Tell us what the device has to do on the first call, in your own words: what it measures or controls, where it lives, how it connects and who uses the data. Your tech lead writes the requirements from that conversation and from whatever already exists, such as schematics, a board or some code. Within 48 hours you get a clickable prototype of the app or dashboard, so you can react to something concrete instead of a document. Over the two weeks the prototype is adjusted with you, and the written result covers the MCU and RTOS choice with the reasoning behind it, connectivity, the OTA and secure-boot path, where certification cost lands, a hardware-in-the-loop test rig design and an estimate with a fixed-price option. If you already have requirements, send them under NDA before the first meeting and we start from them instead, so the first hour goes to questions, not to reading.
What do you need from us, and what does it cost?
From you: one hour for the first meeting, schematics or the board if it exists, and any existing code. Your tech lead does the rest and asks for more only when a decision depends on it. You meet that tech lead within 2 business days of sending the form, and they run the Sprint from the first call to the final hand-over. The Sprint is US$ 900 through Dec 31, 2026, with 10 slots at this price, paid upfront when it starts. If you don't see value in what it delivers, we refund it in full. If you build with us within 30 days, the full fee comes off the project. Either way the architecture, the test rig design and the estimate are yours to keep, so you can take them to your board, to an in-house hire or to another team. Contracts are in US dollars, and all custom code and IP we build for you belong to you from the first commit.
Start Your Firmware Discovery Sprint
A tech lead replies within one business day.